Substation Interface Readiness for Renewable Energy Projects Through a Proposed Standardized Turnover Package Framework
DOI:
https://doi.org/10.56830/IJSIE202614Keywords:
Substation interface readiness, renewable energy interconnection, standardized turnover package, utility turnover requirements, inverter-based resourcesAbstract
In renewable energy projects, the transition to energization and operation of the substation interface must be managed and documented through a coordinated engineering record, commissioning evidence, and formal approval. This paper offers a standardized framework for these records in the turnover package and their application, without replacing utility-specific requirements. The framework is compiled from published interconnection research and select official technical sources, such as Lawrence Berkeley National Laboratory’s Queued Up: 2026 Edition, which projects roughly 8,200 Transmission Interconnection Requests for projects in the U.S. at the end of 2026, including 1,312 GW of generation and approximately 749 GW of storage. The schema consists of 10 modules, 42 core record classes, four readiness gates, and metadata linking each record to the governing source or clause, revision, applicability, owner, evidence location, and approving status of the deliverables. It is important to explicitly record the document edition and project context, as illustrated in the example PJM source document and in ISO projects 1, New England, ERCOT, AEP, IEEE, and NERC. This framework is a design proposal, not an empirical study. No claims are made about prevalence, inter-coder agreement, validation coverage, or reducing rejection or improving the schedule for the requirement. The paper suggests evaluation based on the final project product, first pass, re-submissions, deficiencies, and review time. Project teams need to check the applicability of the governing documents before implementation.
References
Agupugo, C. P., Ajayi, A. O., Nwanevu, C., & S. S. Oladipo. (2022). “Policy and regulatory framework supporting renewable energy microgrids and energy storage systems,”. Engineering Science & Technology Journal,, vol. 5, pp. 2589– 2615,https://www.researchgate.net/profile/Chijioke- Agupugo/publication/383405521_Policy_and_regulatory_framework_supporting_rene wable_energy_microgrids_and_energy_storage_systems/links/66cb49ae920e05672e5 03e68/Policy-and-regulatory-framew.
American Electric Power. (n.d.). “Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System,”. rev. 7. Available: https://www.pjm.com/planning/design-engineering/to-tech-standards/private-aep.aspx.
Anick, K. T., & T. Kabir. (2022). “Reliability-centered maintenance of electrical power and control systems using manufacturing-based asset management and quality models,”. American Journal of Advanced Technology and Engineering Solutions, vol. 2, no. 3, pp. 29–59, 2022. https://ajates-scholarly.com/index.php/ajates/article/view/78.
B. Yondjin Ngamy. (2026). “Grid-code certification by simulation for grid-forming connected inverters,”. Available: https://osuva.uwasa.fi/bitstreams/f5c6c312-fd87-481d-8b45- 81ddd2301c3c/download.
Biswas, S., Tuffner, F., Follum, J., & T. Wall. (2024). “Inverter model validation and calibration using phasor measurement unit data,” . IEEE Access, , vol. 12, pp. 98990– Available: https://ieeexplore.ieee.org/iel8/6287639/6514899/10597432.pdf.
Boff, D. S., & S. E. Barrows. (2023). Waiting in Queue: A Historical Evaluation of Interconnection Policy, PNNL-34350. Richland, WA, USA: Pacific Northwest National Laboratory, http://www.pnl.gov/main/publications/external/technical_reports/PNNL- 34350.pdf?__hstc=249664665.c4a577029c49e44b73bd3bee6fa38565.1739059200047 .1739059200048.1739059200049.1&__hssc=249664665.1.1739059200050&__hsfp=
Clapin, L., & T. Longden. (2024). “Waiting to generate: An analysis of onshore wind and solar PV project development lead-times in Australia,” . Energy Economics, vol. 131, Art.
no. Available: https://www.sciencedirect.com/science/article/pii/S0140988.
Dubey, A., & D. D. Dubey. (2025). “Design management and documentation in construction project management,”. in Handbook of Construction Project Management. Singapore: Springer Nature Singapore, pp. 189–225. https://link.springer.com/content/pdf/10.1007/978https://link.springer.com/content/pdf/10.1007/978-981-96-7631-6_6.pdf.
ERCOT. (n.d.). “Resource Integration: Commissioning Plan Template and ERCOT New Generator Commissioning Checklist.” . Available: https://www.ercot.com/services/rq/integration/.
Federal Energy Regulatory Commission,. (2023). “Improvements to Generator Interconnection Procedures and Agreements,” . Order No. 2023,, Available: https://www.ferc.gov/media/e-1-order-no-2023.
Galeela, M., Fawad, M., Chakravorty, D., Javid, Z., Li, C., & J. Liang. (2026). “Blackstart strategies with grid-forming offshore Type-IV wind turbines and BESS for effective system restoration,”. International Journal of Electrical Power & Energy Systems, vol. 177, Art. no. 111820, 2026. Available: https://www.sciencedirect.com/science/article/pii/S0142061526002620.
Gorman, W., Kemp, J. M., Rand, J., Seel, J., Wiser, R., Manderlink, N., et al. (2025). “Grid connection barriers to renewable energy deployment in the United States,” . Joule, vol. 9, no. 2, 2025. Available: https://www.cell.com/joule/pdfExtended/S2542- 4351(24)00503-8.
Gui, J., Lei, H., & B. K. Johnson. (2024). “A superimposed quantity-based protection method for power systems with inverter-based resources,”. Electric Power Systems Research, vol. 232, Art. no. 110390, 2024. Available: https://www.sciencedirect.com/science/article/am/pii/S0378779624002785.
H. Yin. (2026). “Construction project information system management framework strategy based on version control and collaboration,”. International Journal of Construction Management,, vol. 26, no. 6, pp. 1033–1058, 2026. Available: https://www.tandfonline.com/doi/abs/10.1080/15623599.2025.2542912.
Herling, S., Koza, F., & P. McGlynn. (2016). “The sponsorship model: Competitive construction of transmission facilities in PJM Interconnection,” . IEEE Power and Energy Magazine, vol. 14, no. 4, pp. 65–71, 2016. https://ieeexplore.ieee.org/abstract/document/749143.
Hoke, A., Boemer, J. C., Badrzadeh, B., MacDowell, J., Kurthakoti, D., Marszalkowski, B., et al. (2024). “Foundations for the future power system: Inverter-based resource interconnection standards,”. IEEE Power and Energy Magazine, vol. 22, no. 2, pp. 42–54, Available: https://ieeexplore.ieee.org/abstract/document/10444644/.
IEEE. (2018). IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces,. IEEE Std., 1547-2018, https://www.downloadstandardsnow.com/preview/2024/09/06/f9bb02ddd2fd478eb53a 21999f02fdeb.pdf .
IEEE. (2022). IEEE Standard 2800-2022: Standard for Interconnection and Interoperability of Inverter-Based Resources Interconnecting with Associated Transmission Electric Power Systems. Available: https://ieeexplore.ieee.org/document/9762253.
International Organization for Standardization. (2018). Organization and Digitization of Information About Buildings and Civil Engineering Works, Including Building Information Modelling (BIM): Information Management Using Building Information Modelling, Part 1:Concepts and Principles. ISO 19650-1:2018.
ISO New England. (2024). “Major New Equipment Commissioning Check List Procedure,” . SOP-RTMKTS.0060.0015, rev. 7.1, Dec. 19,, Available: https://www.isone.com/participate/rules-procedures/system-operating-procedures.
K. S. Manoj. (2021). Power System Automation: Build Secure Power System SCADA & Smart Grids.
Notion Press, https://books.google.com/books?hl=en&lr=&id=qEMgEAAAQBAJ&oi=fnd&pg=PT 12&dq=.+Gate+1+included+energization,+completion+inspections,+protection+testin g,+metering+checks,+SCADA+checks,+communications+checks,+and+collated+doc umentation+for+electrical+safety,+.
Lopes, F. V., Davi, M. J., Oleskovicz, M., Hooshyar, A., Dong, X., & A. A. Neto. (2024). “Maturity analysis of protection solutions for power systems near inverter-based resources,”. IEEE Transactions on Power Delivery, vol. 39, no. 5, pp. 2630–2643, 2024. Available: https://ieeexplore.ieee.org/abstract/document/10577496/.
Nasr, M. A., & Hooshyar, A. (2023). “Controlling grid-forming inverters to meet the negative-sequence current requirements of IEEE Standard 2800-2022,”. IEEE Transactions on Power Delivery, vol. 38, no. 4, pp. 2541–2555, 2023. Available:https://ieeexplore.ieee.org/abstract/document/10049127/.
North American Electric Reliability Corporation. (n.d.). “PRC-028-1: Disturbance Monitoring and Reporting Requirements for Inverter-Based Resources.”. Available: https://www.nerc.com/standards/reliability-standards/prc/prc-028-1.
North American Electric Reliability Corporation. (2025). 2025 State of Reliability: Overview,. p. Available: https://www.nerc.com/globalassets/programs/rapa/pa/nerc_sor_2025_overview.pdf.
Ostler, N., Li, F., & L. Dale. (2024). “A new approach to manage the connection queue,” . IET Smart Grid, vol. 7, no. 6, pp. 1064–1073, 2024. Available: https://ietresearch.onlinelibrary.wiley.com/doi/pdfdirect/10.1049/stg2.12200.
Piesciorovsky, E. C., Hink, R. B., Werth, A., Hahn, G., Lee, A., & Y. Polsky. (2023). “Assessment and commissioning of electrical substation grid testbed with a real-time simulator and protective relays/power meters in the loop,”. Energies, vol. 16, no. 11, Art. no. 4407, 2023. Available: https://www.mdpi.com/1996-1073/16/11/4407.
Rand, J., Manderlink, N., Gorman, W., Wiser, R. H., Seel, J., Kemp, J. M., et al. (2024). “Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection as of the End of 2023,”. Available, https://escholarship.org/content/qt50d9w4tn/qt50d9w4tn_noSplash_a8d3a14ce3fd607 7c85fa6f3b7d0fc7a.pdf.
S. E. Culver. (2023). “Interstate electric transmission interference,” . Iowa Law Review, vol. 109, p. 1769, 2023. https://ilr.law.uiowa.edu/sites/ilr.law.uiowa.edu/files/2024- 05/ILR-109-Culver_0.pdf.
Sayed, K., & H. A. Gabbar. (2017). “SCADA and smart energy grid control automation,”. in Smart Energy Grid Engineering. Cambridge, MA, USA: Academic Press, pp. 481– https://www.researchgate.net/profile/Khairy-Sayed- 2/publication/312000929_SCADA_and_smart_energy_grid_control_automation/links/ 5d21afcca6fdcc2462c7b632/SCADA-and-smart-energy-grid-control-automation.pdf .
Zahraoui, Y., Pokhrel, B. R., Oleinikova, I., & S. N. Gros. (2025). “Assessment of TSO-DSO coordination to enhance flexible grid operation,” . Current Sustainable/Renewable Energy Reports, vol. 12, no. 1, p. 20, 2025. Available: https://link.springer.com/content/pdf.